Contingency Plan
Red= Partner, Lewis' Work
Name: Callum Snook
|
|
Title of project:
Live, Die, Repeat
|
|
Potential problem
|
Troubleshooting
methods
|
Pre
Production
|
|
Network going down in college.
|
The network on the mac’s at college, in which we work
our pre production on, can sometimes cripple under the amount of students
working on them and as such we cannot finish our work due to this.
|
People in our group not coming into college and or being
kicked out.
|
If a person in our group decides not to come into
college and doesn’t commit to completing the work that had been shared
between us, we should take under consideration whether they should still be
in our group and we should take responsibility for the work they have not
completed.
|
Loosing pre production work
|
We will make sure to back up the work and make sure we
save it before logging out of the macs. If we are to lose the work we will
have to either recover it or re do the work.
|
Not being able to find actors
|
We will attempt to find actors and if we fail at doing
this we will have to resort to using friends in our short film. We have some
friends on stand by just in case we can not sort the actors out.
|
Production
|
|
Actors not showing up.
|
If one of the actors doesn’t show up we will call them
and check why they are not here. We will try to get them to come in and even
if they cannot we will film with the other actors and rearrange the date of
filming so they are available.
|
Camera being broken/not working.
|
We will be extra careful with the equipment to ensure we
do not break it. In the event of a piece of equipment breaking we will
attempt to fix the problem and failing that we will have to return the
equipment and postpone filming.
|
Drastic change in weather affecting the continuity of
the film.
|
The majority of our filming will be inside meaning this
is a very minor problem for us. However if it does affect us then we will
reschedule the filming to a better date. We will make sure that we film as
much as we can and preferably the whole exterior scene so this does not
happen.
|
Members of the public walking into shot or disrupting
filming.
|
We will make sure that the public are aware that we are
going to be filming in the area. However most of our scenes are interior so
we will most probably not run into this problem.
|
Post Production
|
|
All footage is all lost, deleted or misplaced.
|
Make a lot of back ups and make sure that the files are
all being kept in the same folder. Making back ups will also prevent the likelihood of coming across the same problems again and could future proof us against it in other pieces of work that we would undertake.
|
Video being distorted
|
Always have back ups and learn to shoot the scenes more
effectively. As the former cell had explained, it would be beneficial to make sure that we back up our work to future proof these problems.
|
Audio has been distorted
|
Always have back ups and have clear backgrounds when
recording audio.
|
The video and audio are not in sync.
|
Help fix these problems whilst editing and always
remember to take under consideration that the audio and video needs to be
synced up.
|
The lens cap could have been kept on the camera.
|
Always check that the cap is off when filming.
|
No comments: